JMT was responsible for all surveying services during the construction of a new major league baseball stadium in downtown Baltimore. JMT established horizontal and vertical control throughout the site and set up reference lines to re-establish control points destroyed by construction. Tasks included:
Use of Global Positioning Surveys (GPS) to establish reference points
Construction stakeout and verification of stadium geometric control
Topographic surveys to compute earthwork volume quantities to aid the contractor in determining earthwork volumes.
Utility Surveys
Baseline Stakeouts
As-Built Surveys
JMT is proud to be a part of the successful team that has made this stadium one of the most popular sports venues in the country.