JMT can perform any type of construction stakeout required for roadways, bridges or buildings. JMT Party Chiefs use the flexibility of our data collectors to provide on-site survey control critical to site layout, and our survey technicians provide geometry and control worksheets in both MicroStation and AutoCAD formats.
JMT has provided construction stakeout for large scale construction jobs such as Oriole Park at Camden Yards, M&T Bank Stadium, the Comcast Center, and the expansion of the Baltimore Convention Center.